Q3 2026 PMF quarter — six epics across two bets, plus the engine already shipped.

Epics & Stories

The work, organized by epic. For the time-phased view — which sprint, when, with exit gates — see the Sprint Plan. Each epic below is a live GitHub tracking issue; that issue is the source of truth, this page is the map.

Refreshed for Q3 2026 (Jun–Aug). The previous April–June plan is superseded — see the Sprint Plan for this quarter's context, team, and cash position.

This quarter (Q3 2026 · Jun–Aug)

The whole team is pointed at two bets — PMF via school finance and a mobile public launch — to prove product-market fit with two pilot schools. No monetization this quarter; that is a Q4 decision. Full framing, sprints, and runway live in the Sprint Plan.

EpicBetOwnerTracker
School Finance Module1Abdouthogwarts#313
Onboarding Friction Kill1Abdout / webhogwarts#314
PMF PilotsbothMutaz / Alihogwarts#316
Mobile API Layer2Abdout + Ibrahimhogwarts#315
Mobile Public Launch2Ibrahimios-app
Q3 master trackerAbdoutkun#76

Bet 1 — PMF via School Finance

School Finance Module · hogwarts#313

Build the school's own financial features — fee collection from parents, billing, salaries, payroll. The PMF wedge: the system a school runs its money through is the stickiest seat in the building. (Not Databayt-collects-from-schools billing — that is Q4+.)

  • #255 Finance accounts: readiness & open work
  • #263 Payment system: end-to-end audit, gaps, phased roadmap
  • #264 Auto-provision fee structures at onboarding
  • #269 New fee structure: reuse the announcement approach
  • #273 QA: Fee Lifecycle end-to-end walkthrough
  • Salaries & payroll module v1 — new, to be filed
  • Finance reporting — new, to be filed

Onboarding Friction Kill · hogwarts#314

Eliminate the onboarding friction the pilot reported first-hand — make a few users love you.

  • #254 Outlook/Hotmail not receiving OTP emails
  • #298 no middle-school option
  • #299 teacher count default (200) too high
  • #300 student count multiples-of-5 not practical
  • #301 / #306 responsive breakage
  • #304 back button slow
  • #305 add currency selection
  • #307 Next button stuck after fees

PMF Pilots · hogwarts#316

Two free pilots (King Fahad — Sudanese — plus a 2nd) actively using finance + mobile, with a documented PMF signal that feeds the Q4 cash decision.

  • King Fahad re-engagement + JTBD interviews
  • Source 2nd free pilot (3–5 school pipeline)
  • 2nd pilot onboarding
  • Usage tracking on both pilots
  • PMF write-up + case study → Q4 cash brief

Bet 2 — Mobile Public Launch

Mobile API Layer · hogwarts#315

Backend API layer for the iOS + Android apps. Shares the finance domain with Bet 1 (payments + invoices).

P0 — store gates

  • #274 account export (data portability)
  • #275 account delete
  • #276 translation cache
  • #277 payments (Apple Pay + Stripe)
  • #278 invoices
  • #279 consent (TOS, Privacy, COPPA, GDPR-K)

P1 — teacher / admin / guardian

  • #281 grade entry
  • #282 report cards
  • #283 attendance
  • #284 admin staff + classes
  • #285 online exams
  • #286 teacher schedule
  • #287 guardian write actions
  • #288 universal search

Mobile Public Launch · ios-app

Ship the Hogwarts app to the public App Store (iOS) + Google Play (Android).

  • Unblock tooling — JDK, Xcode simulator/SDK, Code Connect
  • App shell + navigation (Swift + Kotlin)
  • Atoms → screens (auth, dashboard, attendance, fees)
  • Consume the Mobile API Layer
  • Store compliance (privacy, account export/delete, consent)
  • Submit to both stores + public launch
  • ⚠️ Prerequisite: create databayt/kotlin-app — the Android repo does not exist yet

Already shipped — the engine

The kun engine that lets six people operate like twenty. Operational since Phase 1:

CapabilityCount
Agents40
Skills25
MCP servers18
Rules8
Hooks5
Keywords100+

Detail: Configuration · Agents · Architecture · Keywords.

Next — Q4 and beyond

Once PMF is proven this quarter, Q4 opens:

  • The cash decision — light monetization, a pre-seed raise, a sponsored build, or cut burn (see Sprint Plan → Cash and runway).
  • Share-economy framework — the Contribution-Units operational model and the future databayt/revenue repo (Samia-owned R&D; see Share Economy).
  • Deferred products — Mkan soft launch and Souq reactivation, both parked behind Hogwarts this quarter.

For the sprint-by-sprint timeline, exit gates, team long/short vision, and the machine-readiness prerequisites, see the Sprint Plan.